Waypoint connections through NSW Snowy mountains

Im trying to create a ride from south coast, up through the snowies and onto Khancoban and beyond. However when I am plotting tracks along the alpine way from Thredbo, it rediverts the track back up and around Kiandra and Cabramurra and adding another 300 kms to the trip.
Is anyone else experiencing this issue or just me?